Also dubbed #LittleK, this week marks Week 1 of #2308 lovin’ in the form of construction. Phase I will involve the following: excavation, foundation, masonry, underpinning, and waterproofing. The focus this week has been the excavation work needed to build the foundation for the property’s rear addition.
And, in the week prior, #2308 had some leaning trees removed. Power lines, severe wind, and overgrown branches do not mix.
Now, if only my professionally-landscaped yard with its brown grass looked as good as these weeds, trimmed. 🙂
p.s. For those still reading, Miss Utility is a thing. 811 as 311. Call before you dig!